
About This Item
About this item This Device Requires a Subscription. To start using it, simply select the flexible and transparent tariff plan that best fits your needs. Check the product gallery to see the tariff plans. Real-Time GPS Tracker works anywhere with a 4G SIM, keeping your dog safe — know their exact location anytime through the Petloc8 app. iOS & Android. Collar-compatible, lightweight & waterproof design (IP67) makes it perfect for daily adventures — rain or shine. Ideal for active dogs or escape artists, this is perfect for hiking, traveling, and everyday walks, thanks to its long-life battery that works up to 14 days on one charge. Smart alerts and custom Geo-Fence zones notify you instantly if your pet wanders too far. Built-in pet owner community lets family & friends monitor your dog’s safety too — free and instant. › See more product details
















- Package Dimensions: 4.53 x 4.13 x 1.93 inches
- Item Weight: 0.3 ounces
- ASIN: B0DQDHP9Z7
- Item model number: Tracker
- Batteries: 1 Lithium Ion batteries required. (included)
- Customer Reviews: 4.04.0 out of 5 stars(294)4.0 out of 5 stars
- Best Sellers Rank: #18,721 in Pet Supplies (See Top 100 in Pet Supplies)#16 in Pet Location Trackers
- Connectivity technologies: 4G LTE CAT 1, Bluetooth, Wi-Fi
- Special features: Alert Notification, Geo-Fence, Real Time Tracking, Waterproof (IP67) and collar-compatible device
- Other display features: Wireless
- Color: Dog Tracker
- Whats in the box: Collar Mount, User Manual, GPS tracker, Charging Cable
- Manufacturer: PETLOC8
- Date First Available: December 13, 2024
- Brand: PETLOC8
- Special Feature: Alert Notification, Geo-Fence, Real Time Tracking, Waterproof (IP67) and collar-compatible device
- Connectivity Technology: 4G LTE CAT 1, Bluetooth, Wi-Fi
- Supported Application: Petloc8 app, iOS, Android
- Specific Uses For Product: Dog Tracking
Ingredients
What Customers Say